Stockholm, Sweden, long-term cooperation in industry, where a new regeneration boiler is being built. Connections are made throughout the factory so that they are connected to the new boiler. A large amount of m3 of scaffolding is assembled and dismantled every day.
Up to 200-300, scaffolds can be standing in the factory at one time, or they can be under construction. The boiler should be commissioned at the end of 2023.